We explore a New Grid connection to allow decommissioning of the nuclear power station to proceed.
We carried out an Electrical Distribution Architecture Study of the Future Surface Combatant.
We established a quantitative baseline of the electrical power quality at the point of connection of an industrial site with the grid for future reference.
We aim to provide specialist environmental support to rail site investigations.
We provide sustainable procurement advice to ensure that the client’s environmental objectives are incorporated into the process governing the privatisation of the service provision.
We assessed the integrity of high temperature components.
We look into what is needed to show that the corroded header could continue in use to avoid an unplanned shutdown.
We assure the fitness for service of the pipework for current and future operation.
We offer technical support to the Main Gate Business Case programme decision between two solutions.
We look to understand the cause of unusual flow induced vibration.
We predicted high risk areas in pipe geometry allowing the pipe work to be designed more hygienically, reducing the amount spent on cleaning processes.
We aim to ensure the integrity of the vessel for current and future operations.